The drawing below illustrates the pedestrian logistics plan that will be in effect from Monday, December 15, 2025, through project completion in September 2026. Pedestrians will continue to use the sidewalk along 2164 Washington Street, with a minor detour directly in front of the building. The sidewalk immediately adjacent to the building will be closed for construction activities, and the pedestrian pathway will temporarily shift into the parking lane within the street.

2164 Washington Street, Boston, MA 02116